Williams Restack
Interior demolition and rebuild of nine floors on an aggressive schedule, in an occupied environment totaling 140,000 SF.  The scope includes the installation of demountable partitions, acoustic/sheetrock ceilings, new flooring, complete data and phone distribution systems, and MEP work.

Owner: Williams
Architect:  HOK, Inc. 


South Texas College of Law
The building was originally a Ford Motor Car dealership in the 1940’s.  The T. Gerald Treece Courtroom, Advocacy and Student Development Center were built in two phases.  The Advocacy and Student Development Center, which includes the Reception, Mediation Rooms, Dean’s office, and other staff offices.  The existing 1940 concrete ribbed pan deck was painted to allow the original character of the building to show.  The Courtroom, Jury Room, and Board of Advocates Conference Room.  The main focal point of the courtroom is the full height Sapele Pommelle curved wall with stone base (shipped all the way from Italy) behind the Judge’s bench.  Brochstein's had his veneer in their stock for 25 years.  Custom gallery seating with Coach leather cushions, fabric panel walls, an AV system with special scene lighting controls, and ability to record mock trials taking place.  The Conference Room has a custom 18 foot conference table with the Sapele Pommelle inlaid in the center.  The level of detail, tight work space and schedule provided interesting challenges, but Tellepsen finished the project with a happy client.  

Owner: South Texas College of Law
Architect:  Gensler  


Plains All American
Remodeling of 75,000 SF on three floors of the 3 Allen Center building.  Elevator lobbies were renovated with custom finishes, using carpet inserts with stone borders, light coves accented the coffered ceilings and a new main reception area was created using insets in the walls with hidden lighting to highlight artwork.  The reception area featured specialty chandelier fixtures and a new custom red oak reception desk with starburst pattern accents.  The ceilings in the reception area and the boardroom were made of natural finish wood slats surrounded by a drywall soffit.  Perimeter offices on two levels received glass film creating a sectional effect on the glass and Level 14 included a new 2,000 SF computer room.  Building remained operational during construction.

Owner: Plains Marketing L.P.
Architect:  Hunter Moody Architects  


The Staubach Company
Build-out of 14,000 SF on the 25th floor to accommodate Staubach’s new corporate headquarters.  High level finishes including glass office fronts, armourcoat system wall finishes, fabric panel wall coverings and 3’x3’ floor tiles in custom design patterns.

Owner: The Staubach Company
Architect:  Gensler 


Sterling Bank Lobby & Motor Bank
Approximately 14,500 SF of Class A interior build-out of the first floor of Three Memorial City Plaza using stone, carpet, wood and VCT flooring; wood paneling, fabric wall covering and painted walls; lay-in drywall ceiling, extensive millwork, custom doors, teller area and board room table.  

Owner: Sterling Bank
Architect:  Ziegler Cooper  


Santa Fe Snyder Corporate
Pre-construction services and interior build-out of seven floors totaling 150,000 SF in Three Memorial City Plaza Office Building.  There was extensive use of Brochstein’s paneling, metallic vinyl wall covering, stone and custom millwork.

Owner: Santa Fe Energy Resources
Architect:  Ziegler Cooper 


Splitrock Services, Inc.
Unique construction of corporate interiors in Venture-Tech X, a one story office building in The Woodlands, housing administration, customer service and executive offices.  The 70,000 SF space features an open ceiling design, large radius and sloped walls, kitchen area with no walls, children's play center, multi-patterned and colored carpet, audio/visual screening on walls, walls with multi-patterned painting, and an athletic facility with showers.  

Owner: Splitrock Services, Inc.
Architect: Gensler


Coastal Banc Headquarters
Designed to resemble a lighthouse on the Texas Gulf Coast, the 115,000 SF office space featured curved "wave walls," light fixtures that resembled the beacon on a light house, boardwalk corridors, a terrazzo floor that was patterned to look like the coast of Texas and ceilings in the elevator lobbies that utilized fiber optics to recreate the star lit night sky. The lunch room featured stainless steel table tops along the perimeter, custom banquette seating, and hanging graphics to provide the illusion of a tropical underwater scene. Stairwells featured handrail systems that looked like those found on a ship. Port holes and ship lighting features continued the nautical theme.  

Owner: Coastal Banc
Architect: Gensler    


APEX III Award for Best Interiors Project Over 50,000 SF
from the Houston Associated General Contractors


Williams Communications National Technical Resource Center
This unique space was constructed between the first and second floors of the 65-story Transco Tower.  This 45,000 SF project created a dynamic control room with a ceiling height of twenty feet, housing the twelve foot video monitor screens and viewing balconies.  The project included over twenty-two miles of category 5 cable and over six miles of fiber optic cabling.  State-of-the art circuitry systems allow customers to view products, test features and access extensive product information from lower level work stations or from balcony viewing areas.

Owner: Williams Communications Solutions
Architect: 3D/International     APEX III Award for Best Interiors Project Under 50,000 SF
from the Houston Associated General Contractors

Recognition for Excellence in Construction Award
from the Texas Associated General Contractors


Reliant Energy Plaza
This project included over 750,000 SF of "Class A" interior office space in an existing 20 year old, 47-story office building.  The project was completed on a fast paced schedule, where at any one point in time, work was being completed on ten floors simultaneously.  Shifts were staggered to allow for the timely hoisting of manpower and materials.  Within seven months from the beginning of the project, more than 1,000 HL&P employees were moved into the facility while remaining work was completed around occupied space.  The interior design of the project featured large wall panels of glass sandblasted with geometric patterns, core walls were clad in stretched fabric wall coverings and there were large open areas to accommodate the use of modular furniture systems.  The project included the executive headquarters, a cafeteria, computer facilities, employee fitness center, conference rooms, an auditorium and administrative office space.  

Owner: Reliant Energy
Architect: Ziegler Cooper
 

APEX II Award for Best Interiors Project Over 50,000 SF
from the Houston Associated General Contractors


 

Hibernia Bank
Interior remodel of 11,000 square feet in to a banking operations and check processing center. 

Owner: Hibernia
Architect: Gensler